Export and logistics
One handling, from the face to your yard.
Stone is cut, finished, graded and crated inside the family operation, then loaded at our own yard. No trading house, no intermediate warehouse, and no second set of forklift damage.

Capacity
What a container carries
- 20 ft, 25 mm honed
- 264 m²
- 20 ft, 20 mm honed
- 312 m²
- 40 ft, 20 mm honed
- 624 m²
- Mixed colour minimum
- 44 m² per colour
- Weekly output
- 3,200 m²
- Monthly export capacity
- 9 × 20 ft equivalent
12 crates, 19.4 t gross
12 crates, 18.6 t gross
24 crates, 26.2 t gross
Two crates
Across four colours
Current yard throughput
Packing
Everything travels on edge.
Faces separated with 2 mm closed-cell foam, EPS corner blocks, two-direction 19 mm steel banding, and heat-treated ISPM 15 stamped timber. Crates are built to 1180 × 820 mm so twelve fill a 20 ft floor with no dunnage gaps.
Each crate is stencilled with crate number, stone, finish, format and net area. Reported breakage across the last three years of shipments runs at 1.2 percent, credited against photographs.

Lead times
Order to landed
01
Production
21 to 28 days
Single colour, one or two finishes
02
To port
5 days
Road to the port of loading
03
Sea
24 to 32 days
Felixstowe, Southampton, London Gateway
04
Clearance
2 to 4 days
Documents issued before arrival
Quotation basis
To your nearest port, or delivered to your yard.
Both are quoted on request against the schedule you send. Quotations hold for 30 days and include the packing specification and batch test certificates.
Documentation
- Commercial invoice and packing list per crate
- Bill of lading, telex release as standard
- Certificate of origin
- Batch test certificates against BS EN methods
- ISPM 15 fumigation and heat treatment declaration
- UKCA declaration of performance on request